Product Introduction
Integral Cabins are prefabricated modular cabin systems designed for off-site construction replacement in time-sensitive or remote projects.
Core Specifications
|
Dimensions |
2480*5800*2500 (LWH) |
|
Building Area |
10-50㎡+ |
|
Capacity |
1-2 people |
|
Exterior Material |
2.5cm galvanized steel sheet |
|
Frame |
Galvanized steel square tube (2.0-3.0mm) |
|
Wall Insulation |
Rock wool/polyurethane foam |
|
Flooring Options |
Square steel, galvanized steel, cement fiberboard, PVC panels; upgradeable to composite wood or linoleum |
|
Doors & Windows |
Aluminum-plastic glass doors/windows; stainless steel entry door |
|
Bathroom |
PVC/PP piping, toilet, sink, and tempered glass door |
|
Electrical System |
16A sockets, five-hole sockets, leakage protection, control box, switches, and lighting |
|
Key Features |
Heat insulation, cold resistance, Class A Fire-Retardant (Materials compliant with EN 13501-1 / ASTM E84 standards) |
|
Origin |
Shandong, China |
|
Brand |
Aoborui |
Standard & Optional Configurations
Standard Inclusions
Sanitary fixtures (toilet, sink, curtains)
Thermal insulation system
Waterproof & windproof structural enclosure system
Pre-installed lighting system (indoor & outdoor)
Complete electrical wiring system (site-ready connection)
Pre-installed PP water supply system
Pre-installed PVC drainage system
Integrated water filtration system (system-ready)
Optional Upgrades
Interior wall finishes (bamboo-wood fiber panels, artificial stone)
Bathroom system (glass partitions, shower unit, heating & ventilation system)
Interior furnishing system (sofa, beds, tables)
Kitchen system (integrated modular kitchen units)
Appliance integration system (refrigerator, TV)
HVAC system (unit integration-ready, external connection required)
Smart lock system
Typical Applications
Overseas Engineering
Modular cabins for mining camps, oil & gas sites, and remote workforce accommodation projects.
Modular Accommodation Units
Prefab cabins for mountain lodges, eco resorts, tourism accommodation, and off-grid housing developments.
Work Environments
Modular cabins for site offices, construction command centers, field stations, and temporary project-based facilities.
Specialized Use Cases
Prefabricated cabins for rural schools, mobile medical clinics, disaster relief housing, and remote logistics hubs requiring rapid deployment solutions.
Manufacturing Capability
| Annual Production Capacity: | 5,000 units |
| Prefabrication Cycle: | Approx. 25 days (batch production dependent) |
| Automation Level: | High-efficiency integrated production line system |
| Engineering Capability: | In-house modular design and structural engineering support |
Quality Control System
Incoming material inspection (IQC)
In-process quality control (IPQC)
Final product inspection (OQC)
Environmental and durability testing for selected configurations
Batch consistency control system for large-scale orders
Project Cases
New Zealand – Alpine Modular Resort Project
· 22 modular cabin units delivered
· Remote alpine terrain with strict ecological protection requirements
· No excavation or tree removal permitted
· 38㎡ cabin configuration
· Elevated foundation system (~2m)
· Photovoltaic wastewater treatment integration
· Helicopter-assisted installation in restricted terrain
Project Results
· 43-day total delivery cycle
· 82% faster completion vs conventional construction timeline
· 52% reduction in overall project cost
· 95% initial occupancy rate after deployment
FAQ
Hot Tags: integral cabins, China integral cabins manufacturers, suppliers, factory, 40ft Apple Cabin House, Apple Cabin Beach House, Apple Cabin Gardern House, cabin cottages, Modular Cabins, work cabin